MANING DRIVE STEAM PLANT AND UTILITY TUNNEL PROJECT

$29 Million- Completed 2005

Installation of 3,200 LF of open cut, 14'x14' cast-in-place concrete utility tunnels at an average depth of 24-ft. Much of the excavation required blasting of over 60,000 cy of granite. Tunnel mechanical included (2) 30" Chilled Waterlines, (1) 24" LP Steam, (1) 12" HP Steam, (2) 10" Condensate Return Lines, Lighting & Ventilation. Work also included excavation, shoring, and construction of the foundation walls for a new steam plant, construction of 5,000 LF of High Voltage Ductbank.

UTAH STATE UNIVERSITY INFRASTRUCTURE- UTILITY TUNNEL PROJECT

$22.5 Million- Completed in 2002

Design-Build project for the construction of 6,200-ft of cast-in-place concrete utility tunnels incl. steam & condensate piping.  Work included utility relocations, a HV ductbank, and surface restoration.

WHITAKER CONSTRUCTION CO.

Brigham City:

(435) 723-2921

Proud to be 100% Employee-Owned

20222-Whitaker-Holdings-and-Companies-ART.png

St. George:

(435) 673-6152

Contact [email protected] for receivables. Remit payment to:

Dept # Z26611

P.O. Box 26611

​

Contact [email protected] for payables. Remit bills to:

P.O. Box 430

Brigham City, UT 84302

Locations

44 S 1050 W

(435) 723-2921

Brigham City, UT 84302

​

6891 S 700 W Ste 200

Midvale, UT 84047​

​

527 E. Quality Drive

(435) 673-6152

St George, UT 84790

​

1705 S 2050 W

West Haven, UT 84401

​

4336 S 1650 W (A-100 & A-200)

Ogden, UT 84405

  • Twitter
  • Instagram
  • facebook
  • LinkedIn
  • googlePlaces

©2020 by Whitaker Construction, Co. 

bottom of page