SANITARY SEWER

IMG_0374.JPG
CWS Outfall 008.jpg
job#333 144.jpg
DSCF0837.JPG
IMG_0374.JPG
CWS Outfall 008.jpg
job#333 144.jpg
DSCF0837.JPG

WEBER RIVER OUTFALL

$3.2 Million- Completed 2010

Installation of 4,300 of 108" RCP sewer in high groundwater at 20' depths next to the Weber River. Included concrete transition structures, creek and canal crossings.

print.jpg
2014-02-26 11.08.52.jpg
BDO Outfall (2).JPG
IMG_3263.JPG
IMG_3276.JPG
print.jpg
2014-02-26 11.08.52.jpg
BDO Outfall (2).JPG
IMG_3263.JPG
IMG_3276.JPG

BDO OUTFALL SEWER

$14.2 Million- Completed in 2015

This project included installation of approximately 12,000 feet of new 48" to 60" RCP sewer outfall piping, a TBM tunneled pipeline under I-15, an inverted siphon of the Willard Canal and construction of a new 46 mgd sewer lift station with (3) 40HP 20" vertical column pumps designed for 11.5 MGD per pump.

SLC 500 S Diversion Pipeline (1).jpg
SLC 500 S Diversion Pipeline (3).jpg
SLC 500 S Diversion Pipeline (2).jpg
SLC 500 S Diversion Pipeline (4).jpg
SLC 500 S Diversion Pipeline (1).jpg
SLC 500 S Diversion Pipeline (3).jpg
SLC 500 S Diversion Pipeline (2).jpg
SLC 500 S Diversion Pipeline (4).jpg

500 SOUTH DIVERSION PHASE 1 PIPELINE

$15.3 Million- Completed in 2018

This new dual force main project includes installing 12,000 feet of 22" HDPE in a deep excavation and a 54" Tunneled crossing of the Jordan River with 25 foot deep sliderail shoring pits. The project will include extensive dewatering and utility relocations; pigging, odor control and energy dissipation vaults and concrete road restoration

SOUTH JORDAN FORCE MAIN PROJECT

$10.1 Million- Completed in 2010

Construction of two 42-inch (O.D.) HDPE pipelines, approximately 18,000 feet long. Includes  two river crossings (open cut) and two road crossings (bored), installing air/vac valve vaults, including sewage air release valves and sewage vacuum breaker valves, also includes 1,800 linear feet of 48-inch HOBAS gravity sewer line and manholes, and the installation of a 4-inch communications conduit with three 1-inch innerducts along the length of the HDPE pipelines. Restoration of wetlands, golf course and the Jordan River Trail was also required.

WHITAKER CONSTRUCTION CO.

(435) 723-2921

44 South 1050 West 

Brigham City, UT 84302

6891 South 700 West Ste 200

Midvale, UT 84047

1506 S Silicone Way #3B

St George, UT 84770

©2020 by Whitaker Construction Co. Proudly created with Wix.com