SANITARY SEWER
BDO OUTFALL SEWER
$14.2 Million- Completed in 2015
This project included the installation of approximately 12,000 feet of new 48" to 60" RCP sewer outfall piping, a TBM tunneled pipeline under I-15, an inverted siphon of the Willard Canal and construction of a new 46 mgd sewer lift station with (3) 40HP 20" vertical column pumps designed for 11.5 MGD per pump.
500 SOUTH DIVERSION PHASE 1 PIPELINE
$15.3 Million- Completed in 2018
This new dual force main project includes installing 12,000 feet of 22" HDPE in a deep excavation and a 54" Tunneled crossing of the Jordan River with 25-foot deep slide rail shoring pits. The project will include extensive dewatering and utility relocations; pigging, odor control, and energy dissipation vaults, and concrete road restoration
SOUTH JORDAN FORCE MAIN PROJECT
$10.1 Million- Completed in 2010
Construction of two 42-inch (O.D.) HDPE pipelines, approximately 18,000 feet long. Includes two river crossings (open cut) and two road crossings (bored), installing air/vac valve vaults, including sewage air release valves and sewage vacuum breaker valves, also includes 1,800 linear feet of 48-inch HOBAS gravity sewer line and manholes, and the installation of a 4-inch communications conduit with three 1-inch inner ducts along the length of the HDPE pipelines. Restoration of wetlands, golf courses, and the Jordan River Trail was also required.