EARTHWORK

OGDEN BAY WMA STRUCTURE REPAIR PROJECT

$3.2 Million- Completed 2014

This project included rehabilitation and construction of multiple water-regulating structures, levee, and scour hole repair. This work required extensive coffer dam construction, dewatering, earthwork and installation of over 12,000 cy of stabilization material and 4,000 cy of rip-rap.

WHITAKER CONSTRUCTION CO.

(435) 723-2921

44 South 1050 West 

Brigham City, UT 84302

6891 South 700 West Ste 200

Midvale, UT 84047

1506 S Silicone Way #3B

St George, UT 84770

  • Twitter
  • Instagram
  • LinkedIn

©2020 by Whitaker Construction Co. Proudly created with Wix.com

IMG_20140813_091727